IEEE 80 Substation Grounding Studies

Proper grounding is critical for personnel safety and equipment protection in electrical substations. Pythian Design provides comprehensive IEEE 80 compliant grounding studies from soil resistivity analysis through final grid design. Our fast turnaround and practical recommendations help keep your project on schedule while ensuring full safety compliance.

Why Grounding Studies Are Required

Personnel Safety: Touch and step voltages during ground faults can be lethal if grounding is inadequate. IEEE 80 analysis ensures voltages remain within safe limits.

Equipment Protection: Proper grounding protects transformers, circuit breakers, and control systems from transient overvoltages.

Code Compliance: Required by IEEE 80, NESC, and virtually all utility interconnection agreements.

Interconnection Approval: Utilities require grounding studies for all new substations and major modifications.

IEEE 80 Methodology

Soil Resistivity Testing: We coordinate Wenner 4-pin testing and develop accurate soil models (uniform or two-layer).

Fault Current Calculation: Determine maximum grid current and split factor based on system configuration.

Preliminary Grid Design: Size conductors and determine grid spacing based on site constraints.

Touch and Step Voltage Calculations: Using IEEE 80 equations to determine actual voltages during faults.

Safety Criteria Assessment: Calculate tolerable touch/step voltages based on soil resistivity, surface material, and fault duration.

Design Refinement: If initial design does not meet criteria, we optimize with additional ground rods, surface material specifications, or grid modifications.

Standards & Compliance

IEEE 80: Guide for Safety in AC Substation Grounding - the primary standard for all grounding design.
NESC: National Electrical Safety Code grounding requirements.
IEEE 81: Guide for Measuring Earth Resistivity, Ground Impedance, and Earth Surface Potentials.
Utility-Specific Requirements: Many utilities have additional grounding specifications beyond IEEE 80.

What We Deliver

Comprehensive grounding study report including all calculations and analysis
Soil resistivity test results and soil model development
Fault current analysis and grid current calculation
Touch and step voltage calculations with safety margin assessment
Grounding grid layout drawing with conductor sizes, spacing, and depth
Equipment grounding details and connection specifications
Ground rod specifications and locations
Surface material recommendations (crushed rock or other)
PE-stamped report suitable for utility and AHJ submittal

Why Choose Pythian Design

Fast Turnaround: Our streamlined process delivers grounding studies faster than traditional design firms.
IEEE 80 Expertise: Deep understanding of the standard and its practical application to real projects.
Constructable Designs: We provide practical solutions that meet code while being buildable in the field.
PE-Stamped Reports: Accepted by utilities and authorities having jurisdiction nationwide.
Integrated Approach: We coordinate grounding studies with short circuit analysis and other required studies.

Ready to Start Your Project?

Contact us today to discuss your ieee 80 substation grounding studies requirements and timeline.