IEEE 80 Substation Grounding Studies
Proper grounding is critical for personnel safety and equipment protection in electrical substations. Pythian Design provides comprehensive IEEE 80 compliant grounding studies from soil resistivity analysis through final grid design. Our fast turnaround and practical recommendations help keep your project on schedule while ensuring full safety compliance.
Why Grounding Studies Are Required
Personnel Safety: Touch and step voltages during ground faults can be lethal if grounding is inadequate. IEEE 80 analysis ensures voltages remain within safe limits.
Equipment Protection: Proper grounding protects transformers, circuit breakers, and control systems from transient overvoltages.
Code Compliance: Required by IEEE 80, NESC, and virtually all utility interconnection agreements.
Interconnection Approval: Utilities require grounding studies for all new substations and major modifications.
IEEE 80 Methodology
Soil Resistivity Testing: We coordinate Wenner 4-pin testing and develop accurate soil models (uniform or two-layer).
Fault Current Calculation: Determine maximum grid current and split factor based on system configuration.
Preliminary Grid Design: Size conductors and determine grid spacing based on site constraints.
Touch and Step Voltage Calculations: Using IEEE 80 equations to determine actual voltages during faults.
Safety Criteria Assessment: Calculate tolerable touch/step voltages based on soil resistivity, surface material, and fault duration.
Design Refinement: If initial design does not meet criteria, we optimize with additional ground rods, surface material specifications, or grid modifications.
Standards & Compliance
What We Deliver
Why Choose Pythian Design
Ready to Start Your Project?
Contact us today to discuss your ieee 80 substation grounding studies requirements and timeline.
Request a Consultation